UM584622100 Installation and User Instructions
Issue AC, July 3, 2012 Spec. Nos. 584622100, 584622200, 584622300, 584622400 (Model DCS48375)
Page 26 Chapter 5. Installing the Converter Modules and Initially Starting the System
This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy
Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.
INITIALLY STARTING AND CHECKING SYSTEM OPERATION
Initial Startup Preparation
Ensure that all blocks for Chapters 2 through 4 in the Installation Acceptance
Checklist, located in Chapter 1, have been checked.
Ensure no objects block the ventilation openings on the system shelf(s).
Initially Starting the System
Procedure
1) Close the external disconnects or protective devices that supply input power to
the system. Converter modules automatically start.
2) Open each shelf’s front door.
3) Place each distribution circuit breaker (if furnished) to the ON position.
4) Close each shelf’s front door.
Checking System Status
Procedure
1) Observe the status of the indicators located on the main shelf’s front door and
the converter modules. If the system is operating normally, the status of these is
as shown in Table 5-1. Verify there are no external alarms.
Circuit Breaker or
Fuse Open
(Red LED)
Input Voltage OK
(Green LED)
Converter Major
(Red LED)
Converter Minor
(Yellow LED)
Table 5-1
Status and Alarm Indicators