Precision Cooling
For Business-Critical Continuity™
Liebert Mini-Mate2
Operation & Maintenance Manual - 5 Tons, 50 & 60Hz
Vista de pagina 0
1 2 3 4 5 6 ... 67 68

Indice de contenidos

Pagina 1 - Liebert Mini-Mate2

Precision CoolingFor Business-Critical Continuity™Liebert Mini-Mate2™Operation & Maintenance Manual - 5 Tons, 50 & 60Hz

Pagina 2 -

Figure iv Model number designation—water/glycol condensing unitsTable i System configurations—60 HzNominalCapacity Cooling UnitCondensing Un

Pagina 3 - TABLE OF CONTENTS

Introduction11.0 INTRODUCTION1.1 Product Description and FeaturesThe Mini-Mate2™ is a temperature/humidity control system designed to be installed abo

Pagina 4

Introduction21.2.3 SCR Electric ReheatThe optional electric reheat is pulsed rapidly to provide precise temperature control, while cooling is locked o

Pagina 5

Site Preparation and Installation32.0 SITE PREPARATION AND INSTALLATION2.1 Installation ConsiderationsThe evaporator unit is usually mounted above the

Pagina 6

Site Preparation and Installation42.1.2 Location Considerations Locate the evaporator unit over an unobstructed floor space if possible. This will a

Pagina 7 - M MD60E - CHELA

Site Preparation and Installation5Figure 3 Chilled water systems2.2 System Weights2.3 Equipment Inspection Upon ReceiptWhen the unit arrives, do not u

Pagina 8 - MMD92C 2 CHE L A

Site Preparation and Installation62.4 Installing the Ceiling UnitsThe evaporator unit and indoor condensing unit are usually mounted above the ceiling

Pagina 9 - CD65ALAH0

Site Preparation and Installation7If the return air duct is short or if noise is likely to be a problem, sound-absorbing insulation should be used ins

Pagina 10 - CD69W2AH0

Site Preparation and Installation8Water/Glycol Piping—Water and Glycol cooled systems require coolant loop connections as speci-fied in the condensing

Pagina 11 - 1.0 INTRODUCTION

Site Preparation and Installation9Quick Connect FittingsBe especially careful when connecting the quick connect fittings. Read through the following s

Pagina 13 - 2.1.1 Room Preparation

Site Preparation and Installation10Figure 4 Evaporator unit dimensional data39 3/8 "24 "1 1/16 "19 3/4 "1"17 5/8 "8"

Pagina 14

Site Preparation and Installation11Figure 5 Threaded rod and hardware kit installationUnit Base Pan (ref)3/8" Hex Nut Nylock3/8" Hex Nut3/8&

Pagina 15 - 2.2 System Weights

Site Preparation and Installation122.4.4 Electrical ConnectionsEach unit is shipped from the factory with internal wiring completed. Refer to electric

Pagina 16 - Filter Box

Site Preparation and Installation13Figure 6 Evaporator unit electrical connectionsEarth Ground ConnectionConnection terminal for fieldsupplied earth g

Pagina 17 - Humidifier Water Supply Line

Site Preparation and Installation14Figure 7 Close coupled installationEvaporator Unit (Left)Condensing UnitEvaporator Unit Refrigerant Quick Connect F

Pagina 18 - 100 ft (kg per 10m

Site Preparation and Installation152.5 Indoor Air Cooled Centrifugal Fan Condensing Unit Installation2.5.1 Location ConsiderationsThe centrifugal fan

Pagina 19 - Quick Connect Fittings

Site Preparation and Installation16Figure 8 Indoor air cooled centrifugal condensing unit dimensions and pipe connections51 13/16 "1 3/4 "21

Pagina 20 - DPN000218_Rev0

Site Preparation and Installation17Figure 9 Indoor air cooled centrifugal condenser electrical connectionsField Supplied Unit DisconnectSwitch when Fa

Pagina 21

Site Preparation and Installation18Figure 10 System piping with indoor or outdoor air cooled condensing unit2.6 Outdoor Air Cooled Condensing Unit Ins

Pagina 22 - Control Connections

Site Preparation and Installation192.6.2 Piping ConnectionsDetails for Refrigerant (R-22) Loop piping are in 2.4.3 - Piping Connections and Coolant Re

Pagina 23 - DPN000221_Rev0

iTABLE OF CONTENTSPRODUCT MODEL INFORMATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .V1.0 I

Pagina 24

Site Preparation and Installation202.7.3 Piping ConnectionsDetails for Refrigerant (R-22) Loop piping are in 2.4.3 - Piping Connections and Coolant Re

Pagina 25

Site Preparation and Installation21Figure 11 Indoor water/glycol condensing unit dimensional data32 "32 "29 13/16 "33 5/8 "24 &quo

Pagina 26 - DPN000225_Rev0

Site Preparation and Installation22Figure 12 Indoor water/glycol condensing unit electrical field connectionsField Supplied Unit DisconnectSwitch when

Pagina 27 - DPN000226_Rev0

Site Preparation and Installation23Figure 13 System piping with indoor water/glycol cooled condensing unitTube in TubeCondenserTube in TubeCondenserHi

Pagina 28 - 2.6.1 Location Considerations

Site Preparation and Installation242.8 Optional Equipment Piping2.8.1 Free-Cooling CoilThe free-cooling coil is a secondary coil located downstream of

Pagina 29

Site Preparation and Installation252.8.2 Hot Water Reheat CoilBuilding hot water can be piped to a factory-installed hot water reheat coil, located do

Pagina 30 - Regulating Valve

Site Preparation and Installation262.9 Checklist for Completed Installation___ 1. Proper clearance for service access has been maintained around the e

Pagina 31 - DPN000227_Rev0

Microprocessor Control273.0 MICROPROCESSOR CONTROLThe Microprocessor Control for the Liebert Mini-Mate2 unit features an easy to use menu-driven LCD d

Pagina 32 - DPN000228_Rev0

Microprocessor Control283.2 Main Menu <Menu>Press the MENU key to display the Main Menu. The menu selections (in the following order) include: •

Pagina 33 - FACTORY PIPING

Microprocessor Control293.4 StatusThe operator can monitor the percentage heating, cooling, dehumidifying and humidifying status of the unit by select

Pagina 34 - 2.8 Optional Equipment Piping

2.7 Indoor Water and Glycol Cooled Condensing Unit Installation . . . . . . . . . . . . . . . . . . . . . . 192.7.1 Location Consideration

Pagina 35 - DPN000219_Rev0

Microprocessor Control303.8 SetbackThe microprocessor can be programmed for night and weekend setback. Two (2) events can be pro-grammed for a five-da

Pagina 36

Microprocessor Control313.9.3 Humidity Control MethodThe operator may select either relative (direct) or absolute (predictive) humidity control. If “r

Pagina 37 - 3.0 MICROPROCESSOR CONTROL

Microprocessor Control323.10 Change PasswordsThe display will prompt the operator to enter a three digit password when attempting to make changes. The

Pagina 38 - 3.3 Setpoints

Microprocessor Control333.14 Common Alarm EnableEach individual alarm can be selected to activate or deactivate the common alarm relay. If the ener-gi

Pagina 39 - 3.7 Date

Microprocessor Control34Equipment Options SwitchesEquipment options are selected and enabled using DIP switches 1 through 7. These are located on the

Pagina 40 - 3.9 Setup Operation

Microprocessor Control35Test OutputsWhen this feature is selected, the controller is effectively turned off. When stepping from one load to the next,

Pagina 41 - 3.9.4 Show DIP switch

Microprocessor Control36Figure 17 Control menuStatus Display75 F 50%RHNO ALARMSMenuSetpointsStatusActive AlarmsTimeDateSetbackSetup OperationSetpoint

Pagina 42 - 3.13 Alarm Time Delay

Microprocessor Control37Figure 18 Control board—inside evaporatorFigure 19 Wall box boardTB2-4 — Hot Gas BypassTB2-3 — High Head Alarm ConnectionTB2-2

Pagina 43 - 3.16 Custom Text

System Performance Microprocessor Controls384.0 SYSTEM PERFORMANCE MICROPROCESSOR CONTROLSThis section describes in detail how the Mini-Mate2 responds

Pagina 44 - Show Inputs

System Performance Microprocessor Controls394.2.3 Humidification OperationThe canister humidifier is activated when the humidity control calculates a

Pagina 45 - Test Control Board

iii5.0 ALARMS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .405.1 Alarms:

Pagina 46 - Figure 17 Control menu

Alarms405.0 ALARMSThe microprocessor control system will audibly and visually signal all ENABLED Alarms (including two (2) custom alarms). These speci

Pagina 47 - Figure 19 Wall box board

Alarms415.1.3 Humidity LevelThe humidity level alarm may be activated under the following conditions:• High: The room return air humidity exceeds the

Pagina 48 - 4.2 Humidity Control

Alarms425.2 Optional/Custom Alarms5.2.1 Change FilterPeriodically, the return air filters in the evaporator must be changed. The Change Filter alarm n

Pagina 49 - 4.3 Load Control Features

System Operation, Testing and Maintenance436.0 SYSTEM OPERATION, TESTING AND MAINTENANCEThis section describes system testing, maintenance and replace

Pagina 50 - 5.0 ALARMS

System Operation, Testing and Maintenance446.2.3 Blower SystemMonthly inspection of the blower package include: motor mounts, belts, fan bearings and

Pagina 51

System Operation, Testing and Maintenance45Discharge PressureThe discharge pressure will vary greatly with load and ambient conditions (Table 18). The

Pagina 52 - 5.2 Optional/Custom Alarms

System Operation, Testing and Maintenance46Hot Gas Bypass (Optional)OperationThe hot gas bypass valve is installed between the compressor discharge pi

Pagina 53 - 6.1 System Testing

System Operation, Testing and Maintenance47Replacement ProceduresCompressor Replacement—Infrequently a fault in the motor insulation may result in a m

Pagina 54 - Suction Pressure

System Operation, Testing and Maintenance48Proper procedures to remove and replace the failed compressor are:1. Disconnect power2. Attach suction and

Pagina 55

System Operation, Testing and Maintenance495. Over a period of time, the electrode surface will become coated with a layer of insulating material, whi

Pagina 56 - Hot Gas Bypass (Optional)

FIGURESFigure i Model number designation—Evaporators . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Pagina 57 - Replacement Procedures

System Operation, Testing and Maintenance506.2.7 Circuit Board AdjustmentsThe humidifier control board governs humidifier operation. There are three p

Pagina 58

Maintenance Inspection Checklist517.0 MAINTENANCE INSPECTION CHECKLISTLiebert Mini-Mate2 Notes:Signature:__________________________________________

Pagina 59

Troubleshooting528.0 TROUBLESHOOTINGTable 20 TroubleshootingSymptom Possible Cause Check Or RemedyUnit will not startNo power to unit Check voltage at

Pagina 60

Troubleshooting53Cooling cycle too shortSensor response delay too shortIncrease sensor response delay. See 3.11 - Calibrate Sensors.Display freezes an

Pagina 61

Troubleshooting54NOTES

Pagina 65

Ensuring The High Availability0f Mission-Critical Data And Applications.Emerson Network Power, the global leader in enabling business-criticalcontinui

Pagina 66

vPRODUCT MODEL INFORMATIONFigure i Model number designation—EvaporatorsM = Microprocessor ControlM = Mini-Mate2Nominal BTUHs (1000)E = Split Evaporato

Pagina 67

Figure ii Model number designation—chilled water unitsM = Mini-Mate2M = Microprocessor ControlNominal BTUHs (1000)D = Disconnect Switch0 = N

Pagina 68 - SL-10532_REV2_02-07

viiFigure iii Model number designation—air cooled centrifugal condensing unitsMM = Mini-Mate2D = Disconnect Switch0 = No Disconnect SwitchNominal BTUH