
Reference Manual
00809-0100-4801, Rev FA
October 2010
2-11
Rosemount 3051S Series
Figure 2-3. Coplanar Installation
Examples
Figure 2-4. In-Line Installation
Examples
Process Connections 3051S transmitter flange process connection size is
1
/4–18 NPT. Flange
adapters with
1
/2–14 NPT connections are available as the D2 option. Use
your plant-approved lubricant or sealant when making the process
connections. The process connections on the transmitter flange are on
2
1
/8-inch (54 mm) centers to allow direct mounting to a three-valve or
five-valve manifold. Rotate one or both of the flange adapters to attain
connection centers of 2-in. (51 mm), 2
1
/8-in. (54 mm), or 2
1
/4-in. (57 mm).
Install and tighten all four flange bolts before applying pressure to avoid
leakage. When properly installed, the flange bolts will protrude through the top
of the SuperModule housing. Do not attempt to loosen or remove the flange
bolts while the transmitter is in service.
To install adapters to a Coplanar flange, perform the following procedure:
1. Remove the flange bolts.
2. Leaving the flange in place, move the adapters into position with the
O-ring installed.
3. Clamp the adapters and the Coplanar flange to the transmitter module
using the longer of the bolts supplied.
4. Tighten the bolts. Refer to Table 2-1 on page 2-7 for torque
specifications.
GAS SERVICE STEAM SERVICE
FLOW
GAS SERVICE
LIQUID
SERVICE
STEAM SERVICE
Comentarios a estos manuales