Emerson E2 Manual del operador Pagina 52

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 71
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 51
52
6. Lower the side box to provide wrench clearance to
the injection valve bolt.
7. Install a new valve, using new gaskets and torque
to 25 - 30 ft-lb. Note: In an emergency, gaskets
may be re-used if there is no apparent damage to
the gasket such as tearing or delamination.
IMPORTANT! Note that there are two gaskets used.
8. Remount the side box by installing screws “A” and
“B.”
9. Install the injection coil and terminal box harness
connections (push them in until a distinct “snap” is
heard). The connectors are designed to guaran-
tee proper orientation. If they won’t go in, rotate
them 180º and try again.
10. Reconnect the liquid line to the new valve. Note
that trimming the injection valve tube may damage
the internal strainer. Emerson Climate
Technologies, Inc. recommends that modifications
not be made to the tube. Use the same flame pre-
cautions as in step 2.
11. Use approved refrigeration service procedures to
evacuate the compressor and liquid line. Make
certain that liquid is available to the injection valve
by opening the supply valve.
AE8-1337 R1
Vista de pagina 51
1 2 ... 47 48 49 50 51 52 53 54 55 56 57 ... 70 71

Comentarios a estos manuales

Sin comentarios