Emerson Bristol ControlWave LP Manual de instrucciones Pagina 137

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 166
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 136
Section 3 - Grounding & Isolation Page 3-9 S1400CW
all conductive tubing that runs between the pipeline and mounting valve manifold
and/or the units multivariable pressure transducer
all conductive connections or tubing runs between the ControlWave EFM/GFC and
turbine meter, pulse transducer, or any input other device that is mounted on the
pipeline
any Temperature Transducer, Pressure Transmitter, etc. and their mount/interface to
the pipeline
Figure 3-9 - ControlWave EFM (Installation is similar to EFM/GFC/XFC)
Direct Mount Installation (with Cathodic Protection)
The ground conductor connects between the ControlWave EFM/GFC/XFC’s Ground Lug
and a known good earth ground. Connect the cases of Temperature Transducers, Pressure
Transmitters, etc., to the known good earth ground. If the mounting 2-inch pipe is in
continuity with the pipeline it will have to be electrically isolated from the ControlWave
EFM/GFC/XFC. Use a strong heat-shrink material such as RAYCHEM WCSM 68/22 EU
3140. This black tubing will easily slip over the 2-inch pipe and then after uniform heating
(e.g., with a rose-bud torch) it electrically insulates and increases the strength of the pipe
stand.
Vista de pagina 136
1 2 ... 132 133 134 135 136 137 138 139 140 141 142 ... 165 166

Comentarios a estos manuales

Sin comentarios