Emerson Site Manager Manual de usuario Pagina 37

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 130
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 36
Admin Tools Menu Menus • 29
Click the Power Builder link to open the List
Power Builder window.
Scheduling Refresh Point List
Refresh point list is an activity that may be per-
formed at a control system level. When a refresh point
list is performed, information is pulled from the con-
troller and is posted to the database.
For scheduling Refresh Point List, enter a name
and choose whether refreshing the point list should be
run now or on a schedule. Select the type of Schedule
(one-time only, at intervals, or calendar-based).
Scheduling Backup
A Backup saves information from a controller to
the server and can be done at the directory, site, con-
trol system, or unit level.
For scheduling a Backup, enter a name and choose
whether the backup should be run now or on a sched-
ule. Select the type of Schedule (one-time only, at in-
tervals, or calendar-based).
Figure 3-40 - Scheduling Retrieve Logs From List
Figure 3-41 - Scheduling Refresh Point List
Figure 3-42 - Scheduling Backup
Vista de pagina 36
1 2 ... 32 33 34 35 36 37 38 39 40 41 42 ... 129 130

Comentarios a estos manuales

Sin comentarios