AC PowerFor Business-Critical Continuity™Liebert RDC™ Remote Distribution CabinetUser Manual
Installation6To minimize disturbances caused by other loads in the building, the 3-phase power input to the unit should be supplied directly from a de
Installation7Figure 5 Electrical connection location for two inputsUnits with optional junction box havefactory-supplied and wired cabling. Cables mus
Installation8Figure 6 Electrical connection location for four inputsNOTE:Unit has factory-supplied cables wired to eachmain input breaker. Cables must
Installation9Figure 7 Electrical field connections, one input with Liebert LDMFNEUTRAL BUSBARSee Figure 10for details.GROUND BUSBARSee Figure 11for de
Installation10Figure 8 Electrical field connections, two inputs with Liebert LDMFRDC15033Rev. 0Liebert RDC with Square D Panelboards & Liebert LDM
Installation11Figure 9 Electrical field connections, four inputs with Liebert LDMFRDC15032Rev. 0Liebert RDC with Square D Panelboards & Liebert LD
Installation12Figure 10 Outline drawing, neutral busbarFigure 11 Outline drawing, ground busbarISOMETRIC VIEWRDC12020Rev. 215.7"(400mm)3"(76
Installation13Figure 12 Liebert LDMF location details with Square D® panelboardsFigure 13 Liebert LDMF location details with GE panelboardsRDC15039Rev
Installation14Figure 14 Liebert LDMF Liebert SiteScan and Liebert IntelliSlot® location and connection detailsFigure 15 Liebert LDMF adapter board loc
Installation151.6.2 Junction Box Installation A main input power junction box is standard on the four-input Liebert RDC and available as an option on
IMPORTANT SAFETY INSTRUCTIONSNOTERead this entire manual before installing or operating the system.!WARNINGThe shipping bands may be under tension. us
Installation16Figure 16 Four input junction boxFigure 17 Junction box installationRDC12030Rev. 3CUSTOMER CONNECTIONOF MAIN INPUT POWER WIRING; 3 PHASE
Installation17Figure 18 Dual input junction box with tie breakers GNCBARDC12031Rev. 4TOP VIEWRIGHT SIDE VIEWTERMINALDETAILS(TYP.)ISOMETRIC VIEW(WITH C
Installation181.6.3 Conduit Box InstallationThe conduit box mounts under the raised floor as an option to simplify customer connections. The con-duit
Installation19Figure 20 Installation of conduit box1.7 Output Power ConnectionsOutput panelboards with ground and neutral provisions are provided insi
Installation201.8 Liebert LDMF™ Current Transformer (CT) InstallationThe optional Liebert LDMF monitors the main panelboard circuit breaker and indivi
Installation211.8.2 Replacing a CT in the CT ModuleIn the unlikely event a CT in the CT Module should fail, up to six replacement CTs may be installed
Installation22Figure 22 Electrical field connections to branch and subfeed breakers CTsFigure 23 Electrical field connections for Liebert LDMF Modbus
Installation231.9 Liebert LDMF CommunicationConnecting locally to the Liebert LDMF Monitoring option requires a female-to-female (F-F) DB9 null modem
Equipment Inspection and Startup242.0 EQUIPMENT INSPECTION AND STARTUP2.1 Internal InspectionA detailed internal inspection should be performed after
Inspection and Startup Checklist253.0 INSPECTION AND STARTUP CHECKLIST3.1 InspectionExterior Inspection___ 1. Confirm that the exterior of unit is und
iTABLE OF CONTENTSIMPORTANT SAFETY INSTRUCTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . INSIDE FRONT COVER1.0 INSTALLATION . . . .
Inspection and Startup Checklist263.2 Startup___ 1. Make certain that all circuit breakers are in the OFF position and that power to the unit is locke
Operating Instructions274.0 OPERATING INSTRUCTIONS4.1 Startup ProceduresBefore the unit is placed in service after initial installation, after equipme
Operating Instructions284.5 Current Plus MonitoringThe Liebert RDC has a Current Plus Monitoring (CPM) feature that monitors the current and voltage o
Operating Instructions294.6 Liebert LDMF (Optional)If the Liebert RDC is equipped with the optional Liebert LDMF, the monitoring unit is On whenever p
Maintenance305.0 MAINTENANCE5.1 RepairEven the most reliable equipment may fail. Liebert Services is at your service to assure fast repair of your uni
Ensuring The High AvailabilityOf Mission-Critical Data And Applications.Emerson Network Power, the global leader in enabling business-criticalcontinui
iiFIGURESFigure 1 Typical cabinet and floor planning dimension data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2Figure 2 Typi
Installation11.0 INSTALLATION1.1 Unpacking and Preliminary InspectionA top-quality installation begins on the receiving dock.• Inspect the shipping cr
Installation2Figure 1 Typical cabinet and floor planning dimension dataRDC11014Rev. 0FRONT & REAR VIEW RIGHT SIDE VIEWTOP VIEW24"(610mm)24&qu
Installation3Figure 2 Typical tie-breaker cabinet and floor planning dimension dataFRONT & REAR VIEWTOP VIEWRIGHT SIDE VIEWRDC11016Rev. 0RECOMMEND
Installation41.3 Unit PreparationThe Liebert RDC may be easily removed from the shipping pallet and installed by customer person-nel. A typical proced
Installation51.5 Position the Liebert RDC for InstallationRemove one 24" x 24" floor tile. Remove the front and rear doors and the right sid