Setting up the Hardware
11
Eth erne t
Port
6. Install a ground wire between the Chassis Ground Lug and a known good Earth Ground (see
Section 2.3.1.1 of CI-ControlWaveEXP).
7. Install Watchdog /MOSFET Redundancy Switch wiring (see Section 2.3.5.3 of CI-
ControlWaveEXP). (OPTIONAL - perform this step only if you want to use this feature.)
8. Connect Bulk DC Power to the PSSM Module (see Section 2.3.5.1 and Section 2.3.5.2 of CI-
ControlWaveEXP).
9. Install the Bezel so that it covers the PSSM and CPU Modules (see Section 2.3.7 of CI-
ControlWaveEXP).
10. Plug an Ethernet connection from your network into the
Ethernet port of the I/O Rack.
11. Open the Bezel door, and apply power to the I/O Expansion
Rack by setting the Power Switch on the PSSM Module to the
‘1’ position.
12. When the ControlWave I/O Expansion Rack completes its
power-on sequence, the Port 80 display should be blank.
+VIN
1
5
+VINF
-VIN
-VINF
CHASSIS
+12Vdc Bulk Supply #1 Pos. Term.
+12Vdc Bulk Supply #1 Neg. Term.
Chassis Ground
Shared +12Vdc Power Suppl
+VIN
1
5
+VINF
-VIN
-VINF
CHASSIS
+24Vdc Bulk Supply #1 Pos. Term.
+24Vdc Bulk Supply #1 Neg. Term.
Chassis Ground
Shared +24Vdc Power Suppl
Typical Configurations